Quick answer
The Excavation Calculator shows cubic yards of soil to dig out for a foundation, pool, or trench. How it works: Volume = length × width × depth; Cubic yards = cubic feet ÷ 27. For example, with length of 20 ft, width of 10 ft, and depth of 36 in, the you need is 24.44 cubic yards.
How to use the Excavation Calculator
- Enter length.
- Enter width.
- Enter depth.
- Enter extra for waste. Adds a margin for cuts, spills, and uneven ground.
- Read you need and the breakdown. Use Share to send the exact numbers, or Print to save a PDF.
How it's calculated
- Volume = length × width × depth
- Cubic yards = cubic feet ÷ 27
Worked example
With length of 20 ft, width of 10 ft, depth of 36 in, and extra for waste of 10 %:
You need: 24.44 cubic yards. Cubic feet: 660.
Questions people ask
How much extra should I order?
5% to 10% covers uneven ground, compaction, and spills. Go higher for irregular areas.
Why does dug soil take more space?
Loose soil swells. Plan trucks for 20% to 30% more volume than the hole. Use the extra field for this.